Industrial

Project Description Location Year Client
Blue Bird Secondary Crusher Electrical Works Meekatharra, WA  2019  Big Bell Gold Operations Pty Ltd
Kirkalocka Gold Mine Repair works to Kirkalocka Wet Mess Facilities Mount Magnet, WA 2019 Kirkalocka Gold SPV Pty Ltd
Kirkalocka Gold Mine Kirkalocka Mine Upgrade Mount Magnet, WA 2019 Interquip Construction Pty Ltd
Iluka Cataby M001 Project WCP Area LV Electrical Works Eneabba, WA 2019 DIAB Engineering Pty Ltd
Fortnum TX, Switchboard and Power Station works Meekatharra, WA 2018- 2019 Aragon Resources Pty Ltd
Iluka Cataby M001 electrical Works Cataby, WA 2018 - 2019 DIAB Engineering
Gruyere Gold S&I Electrical and communications works Laverton, WA 2018 - 2019 Downer EDI Mining Pty Ltd 
ATCO Gas  Refit works for ATCO Gas PRS System Geraldton 2018-2019 GHS Solutions
Iluka Cataby BSJV HV Electrical Works Cataby, WA 2018-2019 Iluka Resources Ltd
Blue Bird Mine Site Blue Bird Camp Expansion & HV Works Cue, WA 2018- 2019 Big Bell Operations
Westgold Tuckabiana Gold Mine Electrical refurbishment of the Tuckabiana process plant and infrastructure Cue, WA 2017-2018 Big Bell Operations 
Degrussa Copper Mine Paste Plant Electrical Works Degrussa, WA 2017-2018 Interquip 
CBH Geraldton 130kW PV Array Geraldton, WA 2017 Energy Made Clean
Midwest Port Authority Midwest Port Authority CV03 and CV04 Conveyor Gallery Upgrade.  Geraldton, WA 2016 Marine & Civil
Thunderbox Gold Mine Electrical & instrumentation works on the Gravity Control Circuit Leinster, WA 2016 Interquip
CiticPacific Sino Iron Project Provide Labour Hire - Intelligent Lubrication System Installation – Concentrator Lines 3-6 Contract Cape Preston, WA 2015 Karridale Group Pty Ltd
Geraldton Port Decommissioning of cathodic protection at Berths 3, 4, 5 and 6. Geraldton WA 2015 Midwest Ports
Yungngora Power Station 200kW Solar Farm Fitzroy Crossing, WA 2015  MPower
Geraldton Port Berth 6 Lighting Upgrade Geraldton WA 2015 Midwest Ports
Western Turner Syncline S10 Link Road and 33kv Underground Powerline Works Tom Price WA 2014-2015 Brierty
Qube Storage Shed Electrical Design/Construction of Storage Sheds Narngulu WA 2014-2015 Q Design & Construct
Seafields Estate Stage 2A URD installation to sub-division Geraldton WA 2014 CLW Earthmoving
Eastlyn Estate Stage 7 URD installation to 26 x 2000m2 residential blocks Geraldton WA 2014 GPC Earthmoving
Co Operative Bulk Handling Upgrade 4 Augers Canna WA 2014 Co Operative Bulk Handling
Co Operative Bulk Handling Install 2 Conveyor Loader Systems Moonyoonooka WA  2014 Co Operative Bulk Handling
Wodgina Mine Site Power Line Installation and Infrastructure Upgrade Pilbara WA 2014 Global Advanced Metals
Mummaloo Mine Site Process Plant Wubin WA 2014 Top Iron Pty Ltd
Roy Hill Mine Site Heavy Vehicle Yard  Newman WA 2014 Downer Mining EDI
Mummaloo Mine Site Installation of Power Station Wubin WA 2014 Top Iron Pty Ltd
Co Operative Bulk Handling Kalannie Wheat Silo Conveyor and Elevator Upgrade Kalannie WA 2013 Co Operative Bulk Handling
Co Operative Bulk Handling Ocean/Haigh Street Weighbridge and Sample Geraldton WA 2013 Co Operative Bulk Handling
Technology Park  Commercial Sub Division Geraldton WA 2013 WBHO
Geraldton Heights Stage 1 Residential Sub Division Geraldton WA 2013 WBHO
White Road, Morawa  Residential Sub Division Morawa WA 2013 Central Earthmoving
Karara Mining Limited RMS 4 x 110kW Mill Discharge Pumps Morawa WA 2013 Karara Mining Limited
FL Smidth Mobile Stacker Plant, Karara Mine Site Morawa WA 2012-2013 FL Smidth
Bis Industries Bis Workshop and Site Infrastucture, Karara Mine Site Morawa WA 2012-2013 Bis Industries
Karara Mining Limited Karara Facility and Analytical Labaratory  Morawa WA 2012-2013 VDM Construction
Karara Mining Limited Main Warehouse, Electrical Workshop, Boilermaker Workshop & Washdown Bay Facilities Morawa WA 2012-2013 VDM Construction
Sodexo Three Springs Camp Power Station Upgrade Three Springs WA 2012 Karara Mining Limited
Atlas Iron Wodgina Camp Design & Construct 100 Person Accom Camp & Laboratory. Pilbara WA 2012 Precision Camps & Mining
Burnakura Gold Mine  Kentor Gold Mill & Crushing Circuit Upgrade, 11kV Underground TX Upgrade, Camp Upgrade. Meekatharra WA 2011-2012 Elinco Engineering
Atlas Iron McPhee Creek Camp Design & Construct 100 Person Accomadation Camp Pilbara WA 2011-2012 Precision Camps & Mining
Wodgina Mine Site Power Upgrade Powerline re-alignment and HV Upgrade Pilbara WA 2011-2012 BEC Engineering
Bluebird Gold Mine Supply and install Bluebird Crusher Panel Meekatharra WA 2012 Geraldton Hydraulics
FMG Solomon Hub Camp Design & Construct 250 Person Accom Camp Pilbara WA 2011 Precision Camps & Mining
Mac Donald Dowel Camp SKA Design & Construct 40 Person Accom Camp Murchison WA 2011 Precision Camps & Mining
Karara Mining Limited KML Site Infrastructure Works Morawa WA 2010-2013 Karara Mining Limited
Karara Mining Limited Main Site Office     Karara Mining Limited
Karara Mining Limited Camp 1600 Person Accommodation Camp Morawa WA 2010-2011 Doric Construction
Deepdale Stage 8 Residential Sub Division Geraldton WA 2010 Central Earthmoving
Pabdury Exploration Camp  Design & Construct 20 Person Accom Camp Meekatharra WA 2009 Precision Camps & Mining
ADSCS Power Upgrade Bus Duct under floor installation Geraldton WA 2009 Boeing Australia
Geraldton Port Authority Upgrade CV502 Upgrade Geraldton WA 2009 Geraldton Port Authority
Cocos (Keeling) Island Fuel Farm Rumah Buru port fuel farm Cocos (Keeling) Island  2009 Springfield Construction
Co-Operative Bulk Handling CLS installation and upgrade Geraldton, WA 2008 Co-Operative Bulk Handling
Coobina Chromite Mine Electrical, instrumentation and communication installation and commissioning Newman WA 2008 DRA Pacific 
Avoca Gold Mine 160 man Camp Power and communication including temporary 48 man camp Norseman, WA 2007-2008 Avoca Resources
Avoca Gold Mine Heavy Machinery workshop and administration offices, water treatment plant system and infrastructure Norseman, WA 2007 Avoca Resources
Barrick Gold Corporation Ball Mill Upgrade Upgrade 6.6kV high voltage LRS Ball Mill North Mara, Tanzania 2006 Barrick Gold Corporation
Transalta Agnew Power Station, Emu Feeder HV Cable upgrade Leinster, WA 2006 BEC Engineering
Kimberley Diamonds 11kV power line and transformer upgrade Derby, WA 2005 Power West
Woodie Woodie Manganese Mine 3.7mW power station, power line upgrade including transformer sub-stations Woodie Woodie, WA 2005 BEC Engineering
Woodie Woodie Manganese Mine 160t crusher and screening plant HV, LV electrical and instrumentation Woodie Woodie, WA 2005 BEC Engineering
Cadjebut Lead/Zinc Mine Mine decommissioning & recovery of electrical equipment, power line and power station 2004 Pilbara Mines
Equigold Sag Mill Upgrade Upgrade 11kV high voltage LRS and motor starter to Sag Mill Mt Rawdon, Qld 2004 Equigold
Warrego Gold Plant Complete plant refurbishment Warrego NT 2003 Mintrex